Enclosed space entry checklist
Enclosed space entry remains the accident that kills experienced seafarers and the people who try to save them. Work through this in order at the space itself, not in the ship's office. Progress saves in this browser and prints with the permit.
0 of 35 items complete
1. Before the permit is raised
The decision point: can the job be done without entering at all?
2. Permit to work
3. Atmosphere testing
4. Ventilation and access
5. Equipment and rescue readiness
6. During and after the entry
Stop rebuilding this checklist every year.
Full Ahead keeps every item above as a live record against your vessels — due dates, responsible officer, attached evidence and a tamper-evident history an auditor can read. It works offline at sea and syncs when the link returns.
Common questions
What counts as an enclosed space?
Any space with limited openings for entry and exit, inadequate natural ventilation, and not designed for continuous worker occupancy — cargo holds and tanks, ballast and void spaces, cofferdams, duct keels, chain lockers, sewage and fuel tanks, boilers, and spaces adjacent to any of these.
What atmosphere readings are required before entry?
Oxygen at 20.9% by volume, flammable vapour not more than 1% of the lower flammable limit, and toxic gases such as hydrogen sulphide and carbon monoxide below the applicable occupational exposure limit. Readings are taken at several depths with a calibrated, bump-tested meter before any entry is permitted.
How often must enclosed space entry and rescue drills be held?
SOLAS requires crew members with enclosed space entry or rescue responsibilities to participate in a drill at least once every two months, covering PPE checks, communication, rescue equipment, first aid and resuscitation.
Why do rescuers become the casualties?
Because entry is attempted without breathing apparatus when a colleague collapses. The single most effective control is a briefed rescue plan and standby team at the entrance, with the rescue equipment already rigged before anyone goes in.